RAPID/Roadmap

From Open Energy Information

< RAPID

Revision as of 15:24, 20 March 2014 by Kyoung (talk | contribs)

RAPIDRegulatory and Permitting Information Desktop Toolkit
My Projects

Template:RAPID-Subnav Template:RAPID-IconBar

The flowcharts available in this tool cover the major requirements for developing energy projects, including, land access, siting, exploration and drilling, plant construction and operation, grid interconnection, water resource acquisition, and relevant environmental considerations. To use the flowcharts, start with the Overview Flowchart for Section 1, or jump to the Overview Flowchart for a section you are interested in. These Overview Flowcharts will lead you to the federal and state flowcharts you will need.

Regulatory Roadmap

Filter Roadmaps
Narrow your search
with the info below

[ ] SHOW ALL

Technology
[ ] Geothermal
[ ] Solar
[ ] Transmission

Topic
[ ] Land Use Planning
[ ] Siting
[ ] Land Access
[ ] Exploration
more ...

State
[ ] Alaska
[ ] Arizona
[ ] California
[ ] Colorado
more ...

Regulatory Roadmap Sections

1: Land Use Overview

1-FD-a: Land Use Planning Process
1-FD-b: Land Use Plan Amendment Process
1-AK-a: State Land Use Planning
1-CA-a: State Land Use Planning
1-HI-a: Land Use Considerations
1-ID-a: Land Use Considerations
1-MT-a: Land Use Considerations
1-NV-a: State Land Use Planning

2: Preliminary Site Considerations

3: Land Access Process Overview

3-FD-a: Federal Land Leasing
3-FD-b: Tribal Land Leasing
3-FD-c: Right-of-Way Access
3-FD-d: Forest Service Special Use Authorization

3-CO-d: Access Permit 3-AK-h: Alaska Native Claims Settlement Lands Leasing 3-OR-d: Competitive Geothermal Lease 3-OR-b: Easements on Trust and Non-Trust Land 3-MT-c: Encroachment Overview 3-NM-c: Encroachment Overview 3-CO-c: Encroachment Overview 3-ID-c: Encroachment Permit 3-UT-f: Encroachment Permit 3-CA-c: Encroachment Permit 3-MT-e: Encroachment Permit 3-AK-c: Encroachment Permit 3-HI-c: Encroachment Permit 3-OR-c: Encroachment Permit 3-NV-c: Encroachment Permit for NDOT ROW 3-CO-a: Geothermal Lease 3-OR-a: Geothermal Resource Lease 3-UT-d: Geothermal Steam Lease (Utah Non-Trust Lands) 3-UT-e: Geothermal Steam Lease (Utah Trust Lands) 3-UT-g: Grant of Access Permit 3-TX-c: Highway Right of Way Lease 3-TX-b: Land Access 3-WA-b: Land Access Overview 3-MT-d: Land Use License Process 3-AK-e: Land Use Permit 3-ID-d: Land Use Permit 3-TX-f: Lease of Land Trade Lands 3-TX-d: Lease of Permanent School Fund Land 3-TX-g: Lease of Relinquishment Act Lands 3-TX-e: Lease of Texas Parks & Wildlife Department Land 3-OR-e: Noncompetitive Geothermal Lease 3-NM-g: Permit to Construct Access Opening on Public ROW 3-HI-e: Permit to Construct Upon a State Highway ROW 3-HI-f: Permit to Cross or Enter the State Energy Corridor 3-NM-f: Public Highway Utility Accommodation Permit 3-HI-a: Reserved Land Leasing Process 3-NM-e: Right of Entry / Temporary Access Permit 3-AK-b: Right of Ways (ROWs) 3-MT-f: Right-of-Way Easement for Utilities 3-NM-d: State Business Lease 3-AK-a: State Competitive Mineral Leasing Process 3-UT-b: State Easement Process 3-UT-c: State Encroachment Overview 3-NM-a: State Geothermal Lease 3-TX-a: State Geothermal Lease 3-WA-a: State Geothermal Lease 3-MT-a: State Geothermal Resource Lease 3-UT-a: State Geothermal Resource Leasing 3-CA-a: State Geothermal Resource Leasing 3-CA-b: State Land Access 3-NV-b: State Land Access 3-ID-b: State Land Access 3-MT-b: State Land Access 3-WA-d: State Land Lease 3-NV-a: State Land Leasing Process and Land Access 3-ID-a: State Lands Commercial Geothermal Lease 3-HI-b: State Mineral Leasing Process 3-AK-d: State Noncompetitive Mineral Leasing Process 3-NM-b: State Right of Way Easement 3-WA-e: State Right of Way Process 3-ID-e: Term Easement 3-HI-d: Use and Occupancy Permit 3-WA-c: Utility Franchise or Permit Process 3-AK-g: Utility Permit to Construct on ADOT&PF ROW 3-CO-e: Utility or Special Use Permit 4: Exploration Overview 4-FD-d: BLM Exploration Operations 4-FD-a: Exploration Application Process BLM 4-FD-c: Exploration Application Process USFS 4-FD-b: Exploration Pre-Application Process (NV only)