Difference between revisions of "RAPID/BulkTransmission/Georgia/Pre-Existing Land Use"

From Open Energy Information
m (Text replace - "((\|Name=)(.*)) ((\|Tech=)(.*)) ((\|Jurisdiction=)(.*)) ((\|Topic=)(.*)) ((\|GlanceTopic=)(.*))" to "$5$3 $8$6 $11$9 $14$12")
 
Line 1: Line 1:
 
{{RAPID-Overview(Tech-Jurisdiction-Topic)
 
{{RAPID-Overview(Tech-Jurisdiction-Topic)
|Tech=BulkTransmission  
+
|Tech=BulkTransmission
|Jurisdiction=Georgia  
+
|Jurisdiction=Georgia
|Topic=Pre-Existing Land Use  
+
|Topic=Pre-Existing Land Use
|GlanceTopic=Pre-Existing Land Use
+
|StateProcess=In Georgia, a bulk transmission developer should consider the project’s location to determine the land use designation and to comply with potential federal and state development restrictions. Currently, the RAPID Toolkit does not have state specific content regarding pre-existing land use assessments for bulk transmission development in Georgia.
 
}}
 
}}

Latest revision as of 06:24, 1 May 2018

RAPIDRegulatory and Permitting Information Desktop Toolkit
My Projects

Georgia Bulk Transmission Pre-Existing Land Use Assessment(13-GA)

In Georgia, a bulk transmission developer should consider the project’s location to determine the land use designation and to comply with potential federal and state development restrictions. Currently, the RAPID Toolkit does not have state specific content regarding pre-existing land use assessments for bulk transmission development in Georgia.

More Information

Determine Which State and Federal Permits Apply

Use this overview flowchart and following steps to learn which federal and state permits apply to your projects.