This section includes some of the factors the Energy Commission shall consider as a basis for granting a certificate of public convenience and necessity.






Published 
N/A

Year Signed or Took Effect 
1951

Legal Citation 
P.U.C. § 1002.3


DOI 
Not Provided
Check for DOI availability: http://crossref.org


Online 
Internet link for P.U.C. § 1002.3
Citation

P.U.C. § 1002.3 (1951).




"Siting" is not in the list of possible values (Land Use, Land Access, Exploration, Well Field, General Construction, Power Plant, Environment, On Site Evaluation, Cultural Resources, Water Quality, Air Quality, Geological Resources, Aesthetic Resources, Waste & Hazardous Material, Water Access, Site Considerations, Transmission Siting & Interconnection, Plant Decommissioning, Biological Resources, Land Use Assessment) for this property.
,
"Grid Connection" is not in the list of possible values (Land Use, Land Access, Exploration, Well Field, General Construction, Power Plant, Environment, On Site Evaluation, Cultural Resources, Water Quality, Air Quality, Geological Resources, Aesthetic Resources, Waste & Hazardous Material, Water Access, Site Considerations, Transmission Siting & Interconnection, Plant Decommissioning, Biological Resources, Land Use Assessment) for this property.