m (Text replace - "Power Plant," to "General Construction,")
Line 53: Line 53:
 
|MapExtent=
 
|MapExtent=
 
|DOI=
 
|DOI=
|WebSiteURL=
+
|WebSiteURL=http://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?lawCode=PUC&sectionNum=1002.
 
|ReferenceURL=http://leginfo.legislature.ca.gov/faces/codes_displayexpandedbranch.xhtml
 
|ReferenceURL=http://leginfo.legislature.ca.gov/faces/codes_displayexpandedbranch.xhtml
 
|Abstract=This section outlines factors the Energy Commission shall consider as a basis for granting a certificate of public convenience and necessity.  
 
|Abstract=This section outlines factors the Energy Commission shall consider as a basis for granting a certificate of public convenience and necessity.  

Revision as of 13:28, 16 October 2014


OpenEI Reference LibraryAdd to library

Legal Document- Regulation: P.U.C. § 1002

Abstract
This section outlines factors the Energy Commission shall consider as a basis for granting a certificate of public convenience and necessity.






Published 
N/A

Year Signed or Took Effect 
1981

Legal Citation 
P.U.C. § 1002


DOI 
Not Provided
Check for DOI availability: http://crossref.org


Online 
Internet link for P.U.C. § 1002
Citation

P.U.C. § 1002 (1981).




"Siting" is not in the list of possible values (Land Use, Land Access, Exploration, Well Field, General Construction, Power Plant, Environment, On Site Evaluation, Cultural Resources, Water Quality, Air Quality, Geological Resources, Aesthetic Resources, Waste & Hazardous Material, Water Access, Site Considerations, Transmission Siting & Interconnection, Plant Decommissioning, Biological Resources, Land Use Assessment) for this property.
,
"Grid Connection" is not in the list of possible values (Land Use, Land Access, Exploration, Well Field, General Construction, Power Plant, Environment, On Site Evaluation, Cultural Resources, Water Quality, Air Quality, Geological Resources, Aesthetic Resources, Waste & Hazardous Material, Water Access, Site Considerations, Transmission Siting & Interconnection, Plant Decommissioning, Biological Resources, Land Use Assessment) for this property.
"Flora & Fauna Resources" is not in the list of possible values (Land Use, Land Access, Exploration, Well Field, General Construction, Power Plant, Environment, On Site Evaluation, Cultural Resources, Water Quality, Air Quality, Geological Resources, Aesthetic Resources, Waste & Hazardous Material, Water Access, Site Considerations, Transmission Siting & Interconnection, Plant Decommissioning, Biological Resources, Land Use Assessment) for this property.
,
"Nearby Land Use" is not in the list of possible values (Land Use, Land Access, Exploration, Well Field, General Construction, Power Plant, Environment, On Site Evaluation, Cultural Resources, Water Quality, Air Quality, Geological Resources, Aesthetic Resources, Waste & Hazardous Material, Water Access, Site Considerations, Transmission Siting & Interconnection, Plant Decommissioning, Biological Resources, Land Use Assessment) for this property.