Line 446: Line 446:
 
[[File:1 18 18 1.jpg|600px|center]]
 
[[File:1 18 18 1.jpg|600px|center]]
  
<p class=MsoNormal> Figure 1- Unused (on
+
<p class=MsoNormal align=center> Figure 1- Unused (on
 
right) conveyance vs conveyance put in the dirty OB well. </p>
 
right) conveyance vs conveyance put in the dirty OB well. </p>
  
Line 452: Line 452:
 
[[File:1 18 18 2.png|600px|center]]
 
[[File:1 18 18 2.png|600px|center]]
  
<p class=MsoNormal>Figure 2- ATV image of one of the notches in the Injection
+
<p class=MsoNormal align=center>Figure 2- ATV image of one of the notches in the Injection
 
well</p>
 
well</p>
  
Line 458: Line 458:
 
[[File:1 18 18 3.jpg|600px|center]]
 
[[File:1 18 18 3.jpg|600px|center]]
  
<p class=MsoNormal>Figure 3- Flushing out the dirty OB well using the
+
<p class=MsoNormal align=center>Figure 3- Flushing out the dirty OB well using the
 
conveyance.</p>
 
conveyance.</p>
  

Latest revision as of 16:15, 22 May 2020




Daily Shift Report 18 January 2018

Date: 01/18/2018

Written by: Craig Ulrich

SURF Personnel: Bill and Mike

Others Onsite: Robin

Location(s):  4850 Level - EGS Collab SIGMA-V drill site

Purpose:

       Geophysical well logging


Science Hours (total) on Site:

Surface: 1 hrs 00 min

Underground:  22 hrs  00 min


Irregularities:

       Nothing today

 

Actions:

       Arrived on surface at 6:15 am

       Arrived for 6:30 am cage

       After arriving on site performed toolbox talk to discuss the hazards of the day

       Ran ATV in OT well

       E1-I flow rate at 8:10am 1.22 ml/min

       Ran ATV in OB well

       PSB flow rate = 4.0 ml/min

       PST flow rate = 40 ml/min

       Relocate to E1-I

       Ran OTV and ATV in E1-I

       Flush out OB well until clear water

       Did guide walk #3 with Mike Oates

       Relocate logging gear to PDT for tomorrow

       PST flow rate = 40 ml/min

       PSB flow rate = 5 ml/min

       Geophysics crew left at 5:30 pm

 

Documents or Procedures: Drilling & Logging JHA

Materials Receiving/Shipping:

       NA

       Matrix arrived at hotel


Acts of Safety: Daily safety talk


Near Misses or Incidents:Cabling associated with the borehole logging system presented a tripping hazard that was addressed by minimizing the need to step over the cables and better cable management practices.


(Name of Science Group) Personnel Hours (Surface and Underground):

 

 

Name

Surface Hours

Underground Hours

Time In

Time Out

Time In

Time Out

1

Craig Ulrich

6:15

17:45

6:30

17:30

2

Robin Lopez

6:15

17:45

6:30

17:30

3

 

 

 

 

 

 

1 18 18 1.jpg

 Figure 1- Unused (on right) conveyance vs conveyance put in the dirty OB well.


1 18 18 2.png

Figure 2- ATV image of one of the notches in the Injection well


1 18 18 3.jpg

Figure 3- Flushing out the dirty OB well using the conveyance.

 

 

 

 

 

 

 

 

Table 1 Well Flow Rates

 

Well #

1/09/18 (ml/m)

1/11/18 (ml/m)

1/17/18 (ml/m)

1/18/18 (ml/m)

E1-PST

90

60

32

40

E1-PSB

NA

NA

1.7

5

E1-I

NA

NA

0.93

1.22