Difference between revisions of "EGS Collab Daily Shift Reports FY2020"

From Open Energy Information

 
(3 intermediate revisions by the same user not shown)
Line 4: Line 4:
 
==October 2019==
 
==October 2019==
  
<b>[[EGS Collab Daily Shift Reports October 1 2019|October 1 2019]]</b>: Collabplotter computer troubleshooting; PST, PDT, PB, PI and Inj sample collection
+
<b>[[EGS Collab Daily Shift Reports October 1 2019|October 1 2019]]</b>: Collabplotter computer troubleshooting; bio sampling
  
 
* {{#Widget:ExternalLinkButton | action=:Category: EGS Collab 4850 Level | value=4850 Level|class=btn-primary|style = background:SkyBlue}}; [[:Category: EGS Collab Troubleshooting| Troubleshooting]]; [[:Category: EGS Collab Sample Collection | Sample Collection]]
 
* {{#Widget:ExternalLinkButton | action=:Category: EGS Collab 4850 Level | value=4850 Level|class=btn-primary|style = background:SkyBlue}}; [[:Category: EGS Collab Troubleshooting| Troubleshooting]]; [[:Category: EGS Collab Sample Collection | Sample Collection]]
 +
  
 
<b>[[EGS Collab Daily Shift Reports October 8 2019|October 8 2019]]</b>: FTC logging; burst disk in pressure transducer; water sample collection
 
<b>[[EGS Collab Daily Shift Reports October 8 2019|October 8 2019]]</b>: FTC logging; burst disk in pressure transducer; water sample collection
Line 12: Line 13:
 
{{#Widget:ExternalLinkButton | action=:Category: EGS Collab 4100 Level | value=4100 Level|class=btn-primary|style = background:MediumPurple}}
 
{{#Widget:ExternalLinkButton | action=:Category: EGS Collab 4100 Level | value=4100 Level|class=btn-primary|style = background:MediumPurple}}
 
* [[:Category: EGS Collab 4100 Level |<span style="color:purple;">4100 Level</span>]]; [[:Category: EGS Collab Logging | Logging]]; [[:Category: EGS Collab Sample Collection | Sample Collection]]
 
* [[:Category: EGS Collab 4100 Level |<span style="color:purple;">4100 Level</span>]]; [[:Category: EGS Collab Logging | Logging]]; [[:Category: EGS Collab Sample Collection | Sample Collection]]
 +
  
 
<b>[[EGS Collab Daily Shift Reports October 9 2019|October 9 2019]]</b>: FTC and elog logging; water lines rerouted
 
<b>[[EGS Collab Daily Shift Reports October 9 2019|October 9 2019]]</b>: FTC and elog logging; water lines rerouted
  
 
* [[:Category: EGS Collab 4100 Level |<span style="color:purple;">4100 Level</span>]]; {{#Widget:ExternalLinkButton | action=:Category: EGS Collab 4850 Level | value=4850 Level|class=btn-primary|style = background:SkyBlue}}; [[:Category: EGS Collab Logging | Logging]]; [[:Category: EGS Collab Equipment Repair | Equipment Repair]]
 
* [[:Category: EGS Collab 4100 Level |<span style="color:purple;">4100 Level</span>]]; {{#Widget:ExternalLinkButton | action=:Category: EGS Collab 4850 Level | value=4850 Level|class=btn-primary|style = background:SkyBlue}}; [[:Category: EGS Collab Logging | Logging]]; [[:Category: EGS Collab Equipment Repair | Equipment Repair]]
 +
  
 
<b>[[EGS Collab Daily Shift Reports October 10 2019|October 10 2019]]</b>: Impression packer measurements; guide walk
 
<b>[[EGS Collab Daily Shift Reports October 10 2019|October 10 2019]]</b>: Impression packer measurements; guide walk
  
 
* [[:Category: EGS Collab 4100 Level |<span style="color:purple;">4100 Level</span>]]; {{#Widget:ExternalLinkButton | action=:Category: EGS Collab 4850 Level | value=4850 Level|class=btn-primary|style = background:SkyBlue}}
 
* [[:Category: EGS Collab 4100 Level |<span style="color:purple;">4100 Level</span>]]; {{#Widget:ExternalLinkButton | action=:Category: EGS Collab 4850 Level | value=4850 Level|class=btn-primary|style = background:SkyBlue}}
 +
  
 
<b>[[EGS Collab Daily Shift Reports October 11 2019|October 11 2019]]</b>: Packer system setup
 
<b>[[EGS Collab Daily Shift Reports October 11 2019|October 11 2019]]</b>: Packer system setup
  
 
* [[:Category: EGS Collab 4100 Level |<span style="color:purple;">4100 Level</span>]]; [[:Category: EGS Collab Equipment Testing|<span style="color:pink;">Equipment Testing</span>]]
 
* [[:Category: EGS Collab 4100 Level |<span style="color:purple;">4100 Level</span>]]; [[:Category: EGS Collab Equipment Testing|<span style="color:pink;">Equipment Testing</span>]]
 +
  
 
<b>[[EGS Collab Daily Shift Reports October 15 2019|October 15 2019]]</b>: bBio sampling; tracer cocktail preparation
 
<b>[[EGS Collab Daily Shift Reports October 15 2019|October 15 2019]]</b>: bBio sampling; tracer cocktail preparation
  
 
* [[:Category: EGS Collab 4850 Level | <span style="color:green;">4850 Level</span>]]; [[:Category: EGS Collab Troubleshooting| Troubleshooting]]; [[:Category: EGS Collab Sample Collection|Sample Collection]]
 
* [[:Category: EGS Collab 4850 Level | <span style="color:green;">4850 Level</span>]]; [[:Category: EGS Collab Troubleshooting| Troubleshooting]]; [[:Category: EGS Collab Sample Collection|Sample Collection]]
 +
  
 
<b>[[EGS Collab Daily Shift Reports October 16 2019|October 16 2019]]</b>: ISCO pump failure
 
<b>[[EGS Collab Daily Shift Reports October 16 2019|October 16 2019]]</b>: ISCO pump failure
  
 
* {{#Widget:ExternalLinkButton | action=:Category: EGS Collab 4850 Level | value=4850 Level|class=btn-primary|style = background:SkyBlue}}; [[:Category: EGS Collab Equipment Failure| Equipment Failure]]
 
* {{#Widget:ExternalLinkButton | action=:Category: EGS Collab 4850 Level | value=4850 Level|class=btn-primary|style = background:SkyBlue}}; [[:Category: EGS Collab Equipment Failure| Equipment Failure]]
 +
  
 
<b>[[EGS Collab Daily Shift Reports October 17 2019|October 17 2019]]</b>: site inspection
 
<b>[[EGS Collab Daily Shift Reports October 17 2019|October 17 2019]]</b>: site inspection
  
 
* [[:Category: EGS Collab 4100 Level |<span style="color:purple;">4100 Level</span>]]; {{#Widget:ExternalLinkButton | action=:Category: EGS Collab 4850 Level | value=4850 Level|class=btn-primary|style = background:SkyBlue}}
 
* [[:Category: EGS Collab 4100 Level |<span style="color:purple;">4100 Level</span>]]; {{#Widget:ExternalLinkButton | action=:Category: EGS Collab 4850 Level | value=4850 Level|class=btn-primary|style = background:SkyBlue}}
 +
  
 
<b>[[EGS Collab Daily Shift Reports October 22 2019|October 22 2019]]</b>: SIMFIP tool installation; ISCO pump replacement; tracer preparation; bio sampling
 
<b>[[EGS Collab Daily Shift Reports October 22 2019|October 22 2019]]</b>: SIMFIP tool installation; ISCO pump replacement; tracer preparation; bio sampling
  
 
* [[:Category: EGS Collab 4100 Level |<span style="color:purple;">4100 Level</span>]]; [[:Category: EGS Collab Equipment Testing|<span style="color:pink;">Equipment Testing</span>]]; {{#Widget:ExternalLinkButton | action=:Category: EGS Collab 4850 Level | value=4850 Level|class=btn-primary|style = background:SkyBlue}}; [[:Category: EGS Collab Sample Collection | Sample Collection]]; [[:Category: EGS Collab Equipment Repair| Equipment Repair]]
 
* [[:Category: EGS Collab 4100 Level |<span style="color:purple;">4100 Level</span>]]; [[:Category: EGS Collab Equipment Testing|<span style="color:pink;">Equipment Testing</span>]]; {{#Widget:ExternalLinkButton | action=:Category: EGS Collab 4850 Level | value=4850 Level|class=btn-primary|style = background:SkyBlue}}; [[:Category: EGS Collab Sample Collection | Sample Collection]]; [[:Category: EGS Collab Equipment Repair| Equipment Repair]]
 +
  
 
<b>[[EGS Collab Daily Shift Reports October 23 2019|October 23 2019]]</b>: SIMFIP tool installation
 
<b>[[EGS Collab Daily Shift Reports October 23 2019|October 23 2019]]</b>: SIMFIP tool installation
  
 
* [[:Category: EGS Collab 4100 Level |<span style="color:purple;">4100 Level</span>]]; [[:Category: EGS Collab Equipment Testing|<span style="color:pink;">Equipment Testing</span>]]
 
* [[:Category: EGS Collab 4100 Level |<span style="color:purple;">4100 Level</span>]]; [[:Category: EGS Collab Equipment Testing|<span style="color:pink;">Equipment Testing</span>]]
 +
  
 
<b>[[EGS Collab Daily Shift Reports October 24 2019|October 24 2019]]</b>: SIMFIP tool installation and testing
 
<b>[[EGS Collab Daily Shift Reports October 24 2019|October 24 2019]]</b>: SIMFIP tool installation and testing
  
 
* [[:Category: EGS Collab 4100 Level |<span style="color:purple;">4100 Level</span>]]; [[:Category: EGS Collab Equipment Testing|<span style="color:pink;">Equipment Testing</span>]]
 
* [[:Category: EGS Collab 4100 Level |<span style="color:purple;">4100 Level</span>]]; [[:Category: EGS Collab Equipment Testing|<span style="color:pink;">Equipment Testing</span>]]
 +
  
 
<b>[[EGS Collab Daily Shift Reports October 25 2019|October 25 2019]]</b>: SIMFIP test 4100m borehole
 
<b>[[EGS Collab Daily Shift Reports October 25 2019|October 25 2019]]</b>: SIMFIP test 4100m borehole
  
 
* [[:Category: EGS Collab 4100 Level |<span style="color:purple;">4100 Level</span>]]; [[:Category: EGS Collab Equipment Testing|<span style="color:pink;">Equipment Testing</span>]]; {{#Widget:ExternalLinkButton | action=:Category: EGS Collab 4850 Level | value=4850 Level|class=btn-primary|style = background:SkyBlue}}; [[:Category: EGS Collab Sample Collection | Sample Collection]]
 
* [[:Category: EGS Collab 4100 Level |<span style="color:purple;">4100 Level</span>]]; [[:Category: EGS Collab Equipment Testing|<span style="color:pink;">Equipment Testing</span>]]; {{#Widget:ExternalLinkButton | action=:Category: EGS Collab 4850 Level | value=4850 Level|class=btn-primary|style = background:SkyBlue}}; [[:Category: EGS Collab Sample Collection | Sample Collection]]
 +
  
 
<b>[[EGS Collab Daily Shift Reports October 29 2019|October 29 2019]]</b>: Thermistor DAQ calibration; decade box calibration; production packer thermistor calibrat; Kloehn pump cleaning
 
<b>[[EGS Collab Daily Shift Reports October 29 2019|October 29 2019]]</b>: Thermistor DAQ calibration; decade box calibration; production packer thermistor calibrat; Kloehn pump cleaning
  
 
* {{#Widget:ExternalLinkButton | action=:Category: EGS Collab 4850 Level | value=4850 Level|class=btn-primary|style = background:SkyBlue}}; [[:Category: EGS Collab Equipment Testing|<span style="color:pink;">Equipment Testing</span>]]
 
* {{#Widget:ExternalLinkButton | action=:Category: EGS Collab 4850 Level | value=4850 Level|class=btn-primary|style = background:SkyBlue}}; [[:Category: EGS Collab Equipment Testing|<span style="color:pink;">Equipment Testing</span>]]
 +
  
 
<b>[[EGS Collab Daily Shift Reports October 30 2019|October 30 2019]]</b>: SIMFIP tests 4-6 4100m borehole; thermistor calibration; Campbell DAQ and Kloehn pump replacements
 
<b>[[EGS Collab Daily Shift Reports October 30 2019|October 30 2019]]</b>: SIMFIP tests 4-6 4100m borehole; thermistor calibration; Campbell DAQ and Kloehn pump replacements
Line 61: Line 74:
 
* [[:Category: EGS Collab 4100 Level |<span style="color:purple;">4100 Level</span>]]; [[:Category: EGS Collab Stimulation | Stimulation]]; {{#Widget:ExternalLinkButton | action=:Category: EGS Collab 4850 Level | value=4850 Level|class=btn-primary|style = background:SkyBlue}}
 
* [[:Category: EGS Collab 4100 Level |<span style="color:purple;">4100 Level</span>]]; [[:Category: EGS Collab Stimulation | Stimulation]]; {{#Widget:ExternalLinkButton | action=:Category: EGS Collab 4850 Level | value=4850 Level|class=btn-primary|style = background:SkyBlue}}
  
<b>[[EGS Collab Daily Shift Reports October 31 2019|October 31 2019]]</b>: SIMFIP tests 7-8, PST, PDT, PB, PI and Inj sample collection
+
 
 +
<b>[[EGS Collab Daily Shift Reports October 31 2019|October 31 2019]]</b>: SIMFIP tests 7-8; bio sampling
  
 
* [[:Category: EGS Collab 4100 Level |<span style="color:purple;">4100 Level</span>]]; [[:Category: EGS Collab Stimulation | Stimulation]]; {{#Widget:ExternalLinkButton | action=:Category: EGS Collab 4850 Level | value=4850 Level|class=btn-primary|style = background:SkyBlue}}; [[:Category: EGS Collab Sample Collection | Sample Collection]]
 
* [[:Category: EGS Collab 4100 Level |<span style="color:purple;">4100 Level</span>]]; [[:Category: EGS Collab Stimulation | Stimulation]]; {{#Widget:ExternalLinkButton | action=:Category: EGS Collab 4850 Level | value=4850 Level|class=btn-primary|style = background:SkyBlue}}; [[:Category: EGS Collab Sample Collection | Sample Collection]]
Line 67: Line 81:
  
 
==November 2019==
 
==November 2019==
 +
  
 
<b>[[EGS Collab Daily Shift Reports November 5 2019|November 5 2019]]</b>: Thermistor resistance measurements; lower packer tear; thermistor calibration test; Quizix burst disk blown
 
<b>[[EGS Collab Daily Shift Reports November 5 2019|November 5 2019]]</b>: Thermistor resistance measurements; lower packer tear; thermistor calibration test; Quizix burst disk blown
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Stimulation|Stimulation]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]; [[:Category: EGS Collab Equipment Failure|Equipment Failure]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Stimulation|Stimulation]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]; [[:Category: EGS Collab Equipment Failure|Equipment Failure]]
 +
  
 
<b>[[EGS Collab Daily Shift Reports November 6 2019|November 6 2019]]</b>: lower packer replacement; thermistor removal
 
<b>[[EGS Collab Daily Shift Reports November 6 2019|November 6 2019]]</b>: lower packer replacement; thermistor removal
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Repair|Equipment Repair]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Repair|Equipment Repair]]
 +
  
 
<b>[[EGS Collab Daily Shift Reports November 7 2019|November 7 2019]]</b>: Thermistor resistance calibration; thermistor installation
 
<b>[[EGS Collab Daily Shift Reports November 7 2019|November 7 2019]]</b>: Thermistor resistance calibration; thermistor installation
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Stimulation|Stimulation]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Stimulation|Stimulation]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
 +
  
 
<b>[[EGS Collab Daily Shift Reports November 8 2019|November 8 2019]]</b>: Thermistor diagnostic measurements
 
<b>[[EGS Collab Daily Shift Reports November 8 2019|November 8 2019]]</b>: Thermistor diagnostic measurements
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Stimulation|Stimulation]]; [[:Category: EGS Collab Troubleshooting|Troubleshooting]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Stimulation|Stimulation]]; [[:Category: EGS Collab Troubleshooting|Troubleshooting]]
 +
  
 
<b>[[EGS Collab Daily Shift Reports November 12 2019|November 12 2019]]</b>: Power outage; SIMFIP retrieval; camera inspection
 
<b>[[EGS Collab Daily Shift Reports November 12 2019|November 12 2019]]</b>: Power outage; SIMFIP retrieval; camera inspection
  
 
* [[:Category: EGS Collab 4100 Level|4100 Level]]
 
* [[:Category: EGS Collab 4100 Level|4100 Level]]
 +
  
 
<b>[[EGS Collab Daily Shift Reports November 13 2019|November 13 2019]]</b>: Camera inspection
 
<b>[[EGS Collab Daily Shift Reports November 13 2019|November 13 2019]]</b>: Camera inspection
  
 
* [[:Category: EGS Collab 4100 Level|4100 Level]]
 
* [[:Category: EGS Collab 4100 Level|4100 Level]]
 +
  
 
<b>[[EGS Collab Daily Shift Reports November 14 2019|November 14 2019]]</b>: Bio sampling
 
<b>[[EGS Collab Daily Shift Reports November 14 2019|November 14 2019]]</b>: Bio sampling
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Sample Collection|Sample Collection]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Sample Collection|Sample Collection]]
 +
  
 
<b>[[EGS Collab Daily Shift Reports November 19 2019|November 19 2019]]</b>: Tracer injection
 
<b>[[EGS Collab Daily Shift Reports November 19 2019|November 19 2019]]</b>: Tracer injection
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Sample Collection|Sample Collection]]; [[:Category: EGS Collab Manual Flow Measurement| Manual Flow Measurement]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Sample Collection|Sample Collection]]; [[:Category: EGS Collab Manual Flow Measurement| Manual Flow Measurement]]
 +
  
 
<b>[[EGS Collab Daily Shift Reports November 20 2019|November 20 2019]]</b>: Chiller shutdown; tracer BTC development; ISCO pump cleanup
 
<b>[[EGS Collab Daily Shift Reports November 20 2019|November 20 2019]]</b>: Chiller shutdown; tracer BTC development; ISCO pump cleanup
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Circulation|Circulation]]; [[:Category: EGS Collab Sample Collection|Sample Collection]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Circulation|Circulation]]; [[:Category: EGS Collab Sample Collection|Sample Collection]]
 +
  
 
<b>[[EGS Collab Daily Shift Reports November 21 2019|November 21 2019]]</b>: Tracer BTC completion; chiller repair
 
<b>[[EGS Collab Daily Shift Reports November 21 2019|November 21 2019]]</b>: Tracer BTC completion; chiller repair
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Circulation|Circulation]]; [[:Category: EGS Collab Sample Collection|Sample Collection]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Circulation|Circulation]]; [[:Category: EGS Collab Sample Collection|Sample Collection]]
 +
  
 
<b>[[EGS Collab Daily Shift Reports November 22 2019|November 22 2019]]</b>: Bio sampling; hard drive swap
 
<b>[[EGS Collab Daily Shift Reports November 22 2019|November 22 2019]]</b>: Bio sampling; hard drive swap
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Sample Collection|Sample Collection]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Sample Collection|Sample Collection]]
 +
  
 
<b>[[EGS Collab Daily Shift Reports November 26 2019|November 26 2019]]</b>: Chiller inspection; bio sampling; PNNL06 and LBNL 04 disconnected
 
<b>[[EGS Collab Daily Shift Reports November 26 2019|November 26 2019]]</b>: Chiller inspection; bio sampling; PNNL06 and LBNL 04 disconnected
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Sample Collection|Sample Collection]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Sample Collection|Sample Collection]]
 +
  
 
<b>[[EGS Collab Daily Shift Reports November 27 2019|November 27 2019]]</b>: Hard drive swap
 
<b>[[EGS Collab Daily Shift Reports November 27 2019|November 27 2019]]</b>: Hard drive swap
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]
 +
  
 
==December 2019==
 
==December 2019==
 +
  
 
<b>[[EGS Collab Daily Shift Reports December 3 2019|December 3 2019]]</b>: Bio sampling
 
<b>[[EGS Collab Daily Shift Reports December 3 2019|December 3 2019]]</b>: Bio sampling
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Sample Collection|Sample Collection]]; [[:Category: EGS Collab Equipment Failure|Equipment Failure]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Sample Collection|Sample Collection]]; [[:Category: EGS Collab Equipment Failure|Equipment Failure]]
 +
  
 
<b>[[EGS Collab Daily Shift Reports December 6 2019|December 6 2019]]</b>: Hard drive swap; chiller inspection; flowmeter clog
 
<b>[[EGS Collab Daily Shift Reports December 6 2019|December 6 2019]]</b>: Hard drive swap; chiller inspection; flowmeter clog
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Troubleshooting|Troubleshooting]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Troubleshooting|Troubleshooting]]
 +
  
 
<b>[[EGS Collab Daily Shift Reports December 11 2019|December 11 2019]]</b>: Bio sampling
 
<b>[[EGS Collab Daily Shift Reports December 11 2019|December 11 2019]]</b>: Bio sampling
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Sample Collection|Sample Collection]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Sample Collection|Sample Collection]]
 +
  
 
<b>[[EGS Collab Daily Shift Reports December 17 2019|December 17 2019]]</b>: 4100L walkthrough; production borehole thermistor replacement
 
<b>[[EGS Collab Daily Shift Reports December 17 2019|December 17 2019]]</b>: 4100L walkthrough; production borehole thermistor replacement
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab 4100 Level|4100 Level]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab 4100 Level|4100 Level]]
 +
  
 
<b>[[EGS Collab Daily Shift Reports December 18 2019|December 18 2019]]</b>: Production borehole thermistor replacement
 
<b>[[EGS Collab Daily Shift Reports December 18 2019|December 18 2019]]</b>: Production borehole thermistor replacement
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
 +
  
 
<b>[[EGS Collab Daily Shift Reports December 19 2019|December 19 2019]]</b>: Production borehole thermistor replacement
 
<b>[[EGS Collab Daily Shift Reports December 19 2019|December 19 2019]]</b>: Production borehole thermistor replacement
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]
 +
  
 
<b>[[EGS Collab Daily Shift Reports December 20 2019|December 20 2019]]</b>: Triplex pump and motor service; Kloehn pump inspection; production well troubleshooting; kISMET well photos
 
<b>[[EGS Collab Daily Shift Reports December 20 2019|December 20 2019]]</b>: Triplex pump and motor service; Kloehn pump inspection; production well troubleshooting; kISMET well photos
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]; [[:Category: EGS Collab Troubleshooting|Troubleshooting]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]; [[:Category: EGS Collab Troubleshooting|Troubleshooting]]
 +
  
 
<b>[[EGS Collab Daily Shift Reports December 31 2019|December 31 2019]]</b>: Kloehn pump inspection and maintenance
 
<b>[[EGS Collab Daily Shift Reports December 31 2019|December 31 2019]]</b>: Kloehn pump inspection and maintenance
Line 158: Line 194:
  
  
<b>[[EGS Collab Daily Shift Reports January 3 2020|January 3 2020]]</b>
+
<b>[[EGS Collab Daily Shift Reports January 3 2020|January 3 2020]]</b>: Bio sampling
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Sample Collection|Sample Collection]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Sample Collection|Sample Collection]]
  
<b>[[EGS Collab Daily Shift Reports January 7 2020|January 7 2020]]</b>
+
 
 +
<b>[[EGS Collab Daily Shift Reports January 7 2020|January 7 2020]]</b>: Flowmeter and funnel cleanup; seismic workstation troubleshoot; bio sampling
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Sample Collection|Sample Collection]]; [[:Category: EGS Collab Troubleshooting|Troubleshooting]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Sample Collection|Sample Collection]]; [[:Category: EGS Collab Troubleshooting|Troubleshooting]]
  
<b>[[EGS Collab Daily Shift Reports January 9 2020|January 9 2020]]</b>
+
 
 +
<b>[[EGS Collab Daily Shift Reports January 9 2020|January 9 2020]]</b>: rhyolite sample collection; chiller temperature adjustment; CASSM testing
  
 
* [[:Category: EGS Collab 4100 Level|4100 Level]]; [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
 
* [[:Category: EGS Collab 4100 Level|4100 Level]]; [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
  
<b>[[EGS Collab Daily Shift Reports January 14 2020|January 14 2020]]</b>
+
 
 +
<b>[[EGS Collab Daily Shift Reports January 14 2020|January 14 2020]]</b>: flow shutdown; ISCO troubleshooting
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Failure|Equipment Failure]]; [[:Category: EGS Collab Equipment Repair|Equipment Repair]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Failure|Equipment Failure]]; [[:Category: EGS Collab Equipment Repair|Equipment Repair]]
  
<b>[[EGS Collab Daily Shift Reports January 15 2020|January 15 2020]]</b>
+
 
 +
<b>[[EGS Collab Daily Shift Reports January 15 2020|January 15 2020]]</b>: flow shutdown; ISCO troubleshooting
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Failure|Equipment Failure]]; [[:Category: EGS Collab Troubleshooting|Troubleshooting]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Failure|Equipment Failure]]; [[:Category: EGS Collab Troubleshooting|Troubleshooting]]
  
<b>[[EGS Collab Daily Shift Reports January 17 2020|January 17 2020]]</b>
+
 
 +
<b>[[EGS Collab Daily Shift Reports January 17 2020|January 17 2020]]</b>: DTS maintenance; bio sampling
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Sample Collection|Sample Collection]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Sample Collection|Sample Collection]]
  
<b>[[EGS Collab Daily Shift Reports January 21 2020|January 21 2020]]</b>
+
 
 +
<b>[[EGS Collab Daily Shift Reports January 21 2020|January 21 2020]]</b>: Bio sampling
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Sample Collection|Sample Collection]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Sample Collection|Sample Collection]]
  
<b>[[EGS Collab Daily Shift Reports January 28 2020|January 28 2020]]</b>
+
 
 +
<b>[[EGS Collab Daily Shift Reports January 28 2020|January 28 2020]]</b>: Tracer injection; BTC development; pH measurement; DAS setup
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Circulation|Circulation]]; [[:Category: EGS Collab Sample Collection|Sample Collection]]; [[:Category: EGS Collab Manual Flow Measurement| Manual Flow Measurement]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Circulation|Circulation]]; [[:Category: EGS Collab Sample Collection|Sample Collection]]; [[:Category: EGS Collab Manual Flow Measurement| Manual Flow Measurement]]
  
<b>[[EGS Collab Daily Shift Reports January 29 2020|January 29 2020]]</b>
+
 
 +
<b>[[EGS Collab Daily Shift Reports January 29 2020|January 29 2020]]</b>: BTC development; EC/DO measurement; C-dot batch test
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Circulation|Circulation]]; [[:Category: EGS Collab Sample Collection|Sample Collection]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Circulation|Circulation]]; [[:Category: EGS Collab Sample Collection|Sample Collection]]
  
<b>[[EGS Collab Daily Shift Reports January 30 2020|January 30 2020]]</b>
+
 
 +
<b>[[EGS Collab Daily Shift Reports January 30 2020|January 30 2020]]</b>: BTC development; tracer injection
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Circulation|Circulation]]; [[:Category: EGS Collab Sample Collection|Sample Collection]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Circulation|Circulation]]; [[:Category: EGS Collab Sample Collection|Sample Collection]]
  
<b>[[EGS Collab Daily Shift Reports January 31 2020|January 31 2020]]</b>
+
 
 +
<b>[[EGS Collab Daily Shift Reports January 31 2020|January 31 2020]]</b>: Rhodamine-B detection; sorption tests
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Circulation|Circulation]]; [[:Category: EGS Collab Sample Collection|Sample Collection]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Circulation|Circulation]]; [[:Category: EGS Collab Sample Collection|Sample Collection]]
 +
  
 
==February 2020==
 
==February 2020==
  
  
<b>[[EGS Collab Daily Shift Reports February 3 2020|February 3 2020]]</b>
+
<b>[[EGS Collab Daily Shift Reports February 3 2020|February 3 2020]]</b>: OT flow meter plumbed in; shut-in with no back flow achieved
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Circulation|Circulation]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Circulation|Circulation]]
  
<b>[[EGS Collab Daily Shift Reports February 4 2020|February 4 2020]]</b>
+
 
 +
<b>[[EGS Collab Daily Shift Reports February 4 2020|February 4 2020]]</b>: DNA sampling; production interval depressurization; below packer pressurization
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Sample Collection|Sample Collection]]; [[:Category: EGS Collab Circulation|Circulation]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Sample Collection|Sample Collection]]; [[:Category: EGS Collab Circulation|Circulation]]
  
<b>[[EGS Collab Daily Shift Reports February 5 2020|February 5 2020]]</b>
+
 
 +
<b>[[EGS Collab Daily Shift Reports February 5 2020|February 5 2020]]</b>: Production shut-in; injection shut-in
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]
  
<b>[[EGS Collab Daily Shift Reports February 11 2020|February 11 2020]]</b>
+
 
 +
<b>[[EGS Collab Daily Shift Reports February 11 2020|February 11 2020]]</b>: Line burst; televiewer logging
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Logging |Logging]]; [[:Category: EGS Collab Equipment Repair|Equipment Repair]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Logging |Logging]]; [[:Category: EGS Collab Equipment Repair|Equipment Repair]]
  
<b>[[EGS Collab Daily Shift Reports February 12 2020|February 12 2020]]</b>
+
 
 +
<b>[[EGS Collab Daily Shift Reports February 12 2020|February 12 2020]]</b>: E1-P and E1-I televiewer logging
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Logging |Logging]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Logging |Logging]]
  
<b>[[EGS Collab Daily Shift Reports February 13 2020|February 13 2020]]</b>
+
 
 +
<b>[[EGS Collab Daily Shift Reports February 13 2020|February 13 2020]]</b>: E1-P and E1-I televiewer logging
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Logging |Logging]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Logging |Logging]]
  
<b>[[EGS Collab Daily Shift Reports February 14 2020|February 14 2020]]</b>
+
 
 +
<b>[[EGS Collab Daily Shift Reports February 14 2020|February 14 2020]]</b>: Televiewer logging
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Logging |Logging]]; [[:Category: EGS Collab Troubleshooting|Troubleshooting]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Logging |Logging]]; [[:Category: EGS Collab Troubleshooting|Troubleshooting]]
  
<b>[[EGS Collab Daily Shift Reports February 18 2020|February 18 2020]]</b>
+
 
 +
<b>[[EGS Collab Daily Shift Reports February 18 2020|February 18 2020]]</b>: Quizix configuration testing; line repair
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]; [[:Category: EGS Collab Equipment Repair|Equipment Repair]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]; [[:Category: EGS Collab Equipment Repair|Equipment Repair]]
 +
  
 
==March 2020==
 
==March 2020==
  
  
<b>[[EGS Collab Daily Shift Reports March 2 2020|March 2 2020]]</b>
+
<b>[[EGS Collab Daily Shift Reports March 2 2020|March 2 2020]]</b>: Production packer string inspection; resume flow test
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Circulation|Circulation]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Circulation|Circulation]]
  
<b>[[EGS Collab Daily Shift Reports March 3 2020|March 3 2020]]</b>
+
 
 +
<b>[[EGS Collab Daily Shift Reports March 3 2020|March 3 2020]]</b>: Chilled water injection
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Stimulation|Stimulation]]; [[:Category: EGS Collab Circulation|Circulation]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Stimulation|Stimulation]]; [[:Category: EGS Collab Circulation|Circulation]]
  
<b>[[EGS Collab Daily Shift Reports March 4 2020|EGS Collab Daily Shift Reports March 4 2020]]</b>
+
 
 +
<b>[[EGS Collab Daily Shift Reports March 4 2020|March 4 2020]]</b>: Drill location survey; calibration; disassembly
  
 
* [[:Category: EGS Collab 4100 Level|4100 Level]]; [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
 
* [[:Category: EGS Collab 4100 Level|4100 Level]]; [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]

Latest revision as of 20:51, 21 May 2020




October 2019

October 1 2019: Collabplotter computer troubleshooting; bio sampling


October 8 2019: FTC logging; burst disk in pressure transducer; water sample collection

4100 Level


October 9 2019: FTC and elog logging; water lines rerouted


October 10 2019: Impression packer measurements; guide walk

  • 4100 Level;
    4850 Level


October 11 2019: Packer system setup


October 15 2019: bBio sampling; tracer cocktail preparation


October 16 2019: ISCO pump failure

  • 4850 Level
    ; Equipment Failure


October 17 2019: site inspection

  • 4100 Level;
    4850 Level


October 22 2019: SIMFIP tool installation; ISCO pump replacement; tracer preparation; bio sampling


October 23 2019: SIMFIP tool installation


October 24 2019: SIMFIP tool installation and testing


October 25 2019: SIMFIP test 4100m borehole


October 29 2019: Thermistor DAQ calibration; decade box calibration; production packer thermistor calibrat; Kloehn pump cleaning

  • 4850 Level
    ; Equipment Testing


October 30 2019: SIMFIP tests 4-6 4100m borehole; thermistor calibration; Campbell DAQ and Kloehn pump replacements


October 31 2019: SIMFIP tests 7-8; bio sampling


November 2019

November 5 2019: Thermistor resistance measurements; lower packer tear; thermistor calibration test; Quizix burst disk blown


November 6 2019: lower packer replacement; thermistor removal


November 7 2019: Thermistor resistance calibration; thermistor installation


November 8 2019: Thermistor diagnostic measurements


November 12 2019: Power outage; SIMFIP retrieval; camera inspection


November 13 2019: Camera inspection


November 14 2019: Bio sampling


November 19 2019: Tracer injection


November 20 2019: Chiller shutdown; tracer BTC development; ISCO pump cleanup


November 21 2019: Tracer BTC completion; chiller repair


November 22 2019: Bio sampling; hard drive swap


November 26 2019: Chiller inspection; bio sampling; PNNL06 and LBNL 04 disconnected


November 27 2019: Hard drive swap


December 2019

December 3 2019: Bio sampling


December 6 2019: Hard drive swap; chiller inspection; flowmeter clog


December 11 2019: Bio sampling


December 17 2019: 4100L walkthrough; production borehole thermistor replacement


December 18 2019: Production borehole thermistor replacement


December 19 2019: Production borehole thermistor replacement


December 20 2019: Triplex pump and motor service; Kloehn pump inspection; production well troubleshooting; kISMET well photos


December 31 2019: Kloehn pump inspection and maintenance


January 2020

January 3 2020: Bio sampling


January 7 2020: Flowmeter and funnel cleanup; seismic workstation troubleshoot; bio sampling


January 9 2020: rhyolite sample collection; chiller temperature adjustment; CASSM testing


January 14 2020: flow shutdown; ISCO troubleshooting


January 15 2020: flow shutdown; ISCO troubleshooting


January 17 2020: DTS maintenance; bio sampling


January 21 2020: Bio sampling


January 28 2020: Tracer injection; BTC development; pH measurement; DAS setup


January 29 2020: BTC development; EC/DO measurement; C-dot batch test


January 30 2020: BTC development; tracer injection


January 31 2020: Rhodamine-B detection; sorption tests


February 2020

February 3 2020: OT flow meter plumbed in; shut-in with no back flow achieved


February 4 2020: DNA sampling; production interval depressurization; below packer pressurization


February 5 2020: Production shut-in; injection shut-in


February 11 2020: Line burst; televiewer logging


February 12 2020: E1-P and E1-I televiewer logging


February 13 2020: E1-P and E1-I televiewer logging


February 14 2020: Televiewer logging


February 18 2020: Quizix configuration testing; line repair


March 2020

March 2 2020: Production packer string inspection; resume flow test


March 3 2020: Chilled water injection


March 4 2020: Drill location survey; calibration; disassembly