==March 2018==
 
==March 2018==
  
<b>[[EGS Collab Daily Shift Reports March 1 2018|March 1 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports March 1 2018|March 1 2018]]</b>: Monitoring packages construction and installation; system checks
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
  
<b>[[EGS Collab Daily Shift Reports March 2 2018|March 2 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports March 2 2018|March 2 2018]]</b>: Monitoring packages construction and installation; system checks
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
  
<b>[[EGS Collab Daily Shift Reports March 5 2018|March 5 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports March 5 2018|March 5 2018]]</b>: Monitoring packages construction and installation
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]
  
<b>[[EGS Collab Daily Shift Reports March 6 2018|March 6 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports March 6 2018|March 6 2018]]</b>: Monitoring packages construction and installation; pressure verification
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
  
<b>[[EGS Collab Daily Shift Reports March 7 2018|March 7 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports March 7 2018|March 7 2018]]</b>: Inventory/cleanup; power installation
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]
  
<b>[[EGS Collab Daily Shift Reports March 8 2018|March 8 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports March 8 2018|March 8 2018]]</b>: Inventory/cleanup; power installation
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]
  
<b>[[EGS Collab Daily Shift Reports March 13 2018|March 13 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports March 13 2018|March 13 2018]]</b>: Cable routing; VBox Tower computer setup
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
  
<b>[[EGS Collab Daily Shift Reports March 14 2018|March 14 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports March 14 2018|March 14 2018]]</b>: Cable routing; geophone installation
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
  
<b>[[EGS Collab Daily Shift Reports March 15 2018|March 15 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports March 15 2018|March 15 2018]]</b>: Cable testing; DTS setup
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
  
<b>[[EGS Collab Daily Shift Reports March 16 2018|March 16 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports March 16 2018|March 16 2018]]</b>: Monitoring system troubleshooting; data acquisition
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Troubleshooting|Troubleshooting]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Troubleshooting|Troubleshooting]]
  
<b>[[EGS Collab Daily Shift Reports March 19 2018|March 19 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports March 19 2018|March 19 2018]]</b>: Water run test; sewer cam
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
  
<b>[[EGS Collab Daily Shift Reports March 20 2018|March 20 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports March 20 2018|March 20 2018]]</b>: Water run test; E1-OT grouting
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
  
<b>[[EGS Collab Daily Shift Reports March 21 2018|March 21 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports March 21 2018|March 21 2018]]</b>: E1-OB, E1-PBD grouting
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
  
<b>[[EGS Collab Daily Shift Reports March 22 2018|March 22 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports March 22 2018|March 22 2018]]</b>: E1-PDT, E1-PSB, E1-PST grouting
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]
  
<b>[[EGS Collab Daily Shift Reports March 26 2018|March 26 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports March 26 2018|March 26 2018]]</b>: Sawmill
  
 
* [[:Category: EGS Collab Offsite|Offsite]]
 
* [[:Category: EGS Collab Offsite|Offsite]]
  
<b>[[EGS Collab Daily Shift Reports March 27 2018|March 27 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports March 27 2018|March 27 2018]]</b>: Sawmill; water collection
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Offsite|Offsite]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Offsite|Offsite]]
  
<b>[[EGS Collab Daily Shift Reports March 28 2018|March 28 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports March 28 2018|March 28 2018]]</b>: Sawmill; grout measurements; PSB flow measurement
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]; [[:Category: EGS Collab Offsite|Offsite]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]; [[:Category: EGS Collab Offsite|Offsite]]
  
<b>[[EGS Collab Daily Shift Reports March 29 2018|March 29 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports March 29 2018|March 29 2018]]</b>: Pressure regulating valves installed; VFD controller remounted; seismic equipment inspection
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
  
<b>[[EGS Collab Daily Shift Reports March 30 2018|March 30 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports March 30 2018|March 30 2018]]</b>: Lines connected
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]
Line 362: Line 362:
 
==April 2018==
 
==April 2018==
  
<b>[[EGS Collab Daily Shift Reports April 3 2018|April 3 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports April 3 2018|April 3 2018]]</b>: stim/flow connection; stage seismic equipment
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
  
<b>[[EGS Collab Daily Shift Reports April 4 2018|April 4 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports April 4 2018|April 4 2018]]</b>: Seismic testing; stim/flow setup
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
  
<b>[[EGS Collab Daily Shift Reports April 5 2018|April 5 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports April 5 2018|April 5 2018]]</b>: Seismic measurements; stim/flow setup
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
  
<b>[[EGS Collab Daily Shift Reports April 10 2018|April 10 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports April 10 2018|April 10 2018]]</b>: Stim/flow system testing; seismic imaging; electrical resistance tomography imaging
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]] [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]] [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
  
<b>[[EGS Collab Daily Shift Reports April 11 2018|April 11 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports April 11 2018|April 11 2018]]</b>: Stim/flow system testing; seismic imaging; electrical resistance tomography imaging
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
  
<b>[[EGS Collab Daily Shift Reports April 12 2018|April 12 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports April 12 2018|April 12 2018]]</b>: Stim/flow shakedown setup; seismic imaging; electrical resistance tomography imaging
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
  
<b>[[EGS Collab Daily Shift Reports April 16 2018|April 16 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports April 16 2018|April 16 2018]]</b>: Seismic imaging; electrical resistance tomography imaging
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
  
<b>[[EGS Collab Daily Shift Reports April 17 2018|April 17 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports April 17 2018|April 17 2018]]</b>: Seismic imaging; thermistor hookup; pressure system test; water sampling
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]] [[:Category: EGS Collab Sample Collection|Sample Collection]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]] [[:Category: EGS Collab Sample Collection|Sample Collection]]
  
<b>[[EGS Collab Daily Shift Reports April 18 2018|April 18 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports April 18 2018|April 18 2018]]</b>: Seismic imaging; thermistor hookup; pressure system demo; water sampling
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]] [[:Category: EGS Collab Sample Collection|Sample Collection]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]] [[:Category: EGS Collab Sample Collection|Sample Collection]]
  
<b>[[EGS Collab Daily Shift Reports April 19 2018|April 19 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports April 19 2018|April 19 2018]]</b>: Seismic imaging; thermistor hookup; interference tests
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
  
<b>[[EGS Collab Daily Shift Reports April 23 2018|April 23 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports April 23 2018|April 23 2018]]</b>: Saw mill; tool unpacking
  
 
* [[:Category: EGS Collab Offsite|Offsite]]
 
* [[:Category: EGS Collab Offsite|Offsite]]
  
<b>[[EGS Collab Daily Shift Reports April 24 2018|April 24 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports April 24 2018|April 24 2018]]</b>: Seismic imaging; thermistor hookup; Quizix pressurization
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
  
<b>[[EGS Collab Daily Shift Reports April 25 2018|April 25 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports April 25 2018|April 25 2018]]</b>: Seismic imaging; Triplex pressurization; packer conveyance; production packer assembly
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
  
<b>[[EGS Collab Daily Shift Reports April 26 2018|April 26 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports April 26 2018|April 26 2018]]</b>: Seismic imaging; water chillers/240VAC installation; SIMFIP tool assembly
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
  
<b>[[EGS Collab Daily Shift Reports April 30 2018|April 30 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports April 30 2018|April 30 2018]]</b>: downhole stimulation instrument setup; stim/monitoring equipment verification
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
Line 425: Line 425:
 
==May 2018==
 
==May 2018==
  
<b>[[EGS Collab Daily Shift Reports May 1 2018|May 1 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports May 1 2018|May 1 2018]]</b>: downhole stimulation instrument setup; stim/monitoring equipment verification; borehole geophone grouting
  
 
* [[:Category: EGS Collab 4850 Level| 4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
 
* [[:Category: EGS Collab 4850 Level| 4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
  
<b>[[EGS Collab Daily Shift Reports May 2 2018|May 2 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports May 2 2018|May 2 2018]]</b>: downhole stimulation instrument setup; stim/monitoring equipment verification; water air-lifting
  
 
* [[:Category: EGS Collab 4850 Level| 4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
 
* [[:Category: EGS Collab 4850 Level| 4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
  
<b>[[EGS Collab Daily Shift Reports May 3 2018|May 3 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports May 3 2018|May 3 2018]]</b>: downhole stimulation instrument setup; stim/monitoring equipment verification; sonic logging
  
 
* [[:Category: EGS Collab 4850 Level| 4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
 
* [[:Category: EGS Collab 4850 Level| 4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
  
<b>[[EGS Collab Daily Shift Reports May 14 2018|May 14 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports May 14 2018|May 14 2018]]</b>: Probe assembly; SIMFIP tool assembly; data transmissions
  
 
* [[:Category: EGS Collab 4850 Level| 4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
 
* [[:Category: EGS Collab 4850 Level| 4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
  
<b>[[EGS Collab Daily Shift Reports May 15 2018|May 15 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports May 15 2018|May 15 2018]]</b>: stimulation tool assembly, probe insertion
  
 
* [[:Category: EGS Collab 4850 Level| 4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
 
* [[:Category: EGS Collab 4850 Level| 4850 Level]]; [[:Category: EGS Collab Equipment Testing|Equipment Testing]]
  
<b>[[EGS Collab Daily Shift Reports May 16 2018|May 16 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports May 16 2018|May 16 2018]]</b>: SIMFIP tool lowered; production probe assembly
  
 
* [[:Category: EGS Collab 4850 Level| 4850 Level]]
 
* [[:Category: EGS Collab 4850 Level| 4850 Level]]
  
<b>[[EGS Collab Daily Shift Reports May 17 2018|May 17 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports May 17 2018|May 17 2018]]</b>: Injection packer conveyance; production packer assembly
  
 
* [[:Category: EGS Collab 4850 Level| 4850 Level]]
 
* [[:Category: EGS Collab 4850 Level| 4850 Level]]
  
<b>[[EGS Collab Daily Shift Reports May 21 2018|May 21 2018]]</b>
+
<b>[[EGS Collab Daily Shift Reports May 21 2018|May 21 2018]]</b>: Production SIMFIP assembly; fracture stimulation 140 notch
  
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Stimulation|Stimulation]]
 
* [[:Category: EGS Collab 4850 Level|4850 Level]]; [[:Category: EGS Collab Stimulation|Stimulation]]

Revision as of 21:30, 22 May 2020




October 2017

October 2 2017: Drill rig transportation

October 3 2017: Drill location surveying

October 4 2017: E1-OT and E1-OB drilling

October 5 2017: Borehole casing; core logging

October 10 2017: Borehole drilling; core logging

October 11 2017: Borehole drilling; gyro logging; core logging

October 12 2017: Borehole drilling; core logging

October 13 2017: Borehole drilling; gyro logging; core logging

October 16 2017: Drilling E1-OB; core logging

October 17 2017: Drilling E1-OB; pressure testing; core logging

October 18 2017: Drilling E1-OB; core logging

October 19 2017: Drilling E1-OB; core logging

October 24 2017: Core logging

October 25 2017: Drilling E1-P; core logging

October 26 2017: E1-P casing

October 27 2017: E1-P casing

October 30 2017

October 31 2017


November 2017

November 1 2017: E1-P drilling; core logging; bio sampling

November 2 2017: E1-P drilling; core logging; bio sampling

November 7 2017: Flow measurements E1-P, E1-OB, and E1-OB; E1-I drilling; core logging

November 8 2017: Flow measurements E1-P, E1-OT; E1-I drilling; gyro logging; core logging

November 9 2017: Flow measurements E1-P, E1-OT; E1-I drilling; core logging

November 13 2017: E1-I drilling; core logging

November 14 2017: Geophysical logging; E1-I drilling; core logging

November 15 2017: E1-I drilling; geophysical logging; core logging; notch location selection

November 16 2017: E1-I notching; quartz survey

November 27 2017: Location marked for E1-PDT and E1-PDB

November 28 2017: E1-PDT drilling; water collection E1-I; core logging

November 30 2017: E1-PDT Drilling; gyro logging; core logging


December 2017

December 5 2017: E1-PDT drilling; core logging

December 6 2017 E1-PDT drilling; core logging; E1-PDB drilling

December 7 2017 Pressure test; E1-PDB drilling; core logging

December 8 2017: E1-PDB drilling; core logging

December 10 2017: E1-PDB drilling; core logging

December 11 2017: E1-PDB completion; E1-PSB drilling and casing; gyro survey tool malfunction; core logging

December 12 2017: Pressure test; E1-PSB drilling; core logging

December 13 2017: E1-PSB drilling; subcore sampling; core logging

December 14 2017: E1-PSB completion; E1-PST drilling and casing; core logging

December 19 2017: E1-PST drilling; core logging

December 20 2017: E1-PST drilling; gyro logging; core logging

December 21 2017: E1-PST drilling; gyro logging

December 22 2017: Core/logging equipment transportation


January 2018

January 4 2018: Surface-admin building

January 8 2018: Geophysical well logging and surveying

January 9 2018: Resistivity sonde failure; E1-PST outflow measurement; geophysical well logging

January 10 2018: Geophysical well logging and surveying; bio sampling

January 11 2018: Geophysical well logging and surveying

January 16 2018: Geopyhsical well logging

January 17 2018: Geophysical well logging; PST and PSB flow rates

January 18 2018: Geophysical well logging; PST and PSB flow rates

January 19 2018: Geophysical well logging; PDB obstruction

January 22 2018: Geophysical well logging; PSB obstruction; PST flow rate

January 23 2018: Geophysical well logging; PST flow rate

January 24 2018: Geophysical well logging; PST flow rate

January 25 2018: PDB and PDT geophysical well logging; PST flow rate


February 2018

February 5 2018: Well temperature logging

February 6 2018: Well/fracture hydraulic connectivity tests

February 7 2018: Well/fracture hydraulic connectivity tests

February 8 2018: Well/fracture hydraulic connectivity tests

February 20 2018: Motor repair shop

February 21 2018: Motor repair shop; huddle testing

February 22 2018: Motor repair shop; huddle testing

February 23 2018: Motor repair shop; huddle testing

February 26 2018: Motor repair shop; huddle testing

February 27 2018: Motor repair shop; monitoring package assembly; fiber measurements testing

February 28 2018: Monitoring package assembly; fiber measurements testing


March 2018

March 1 2018: Monitoring packages construction and installation; system checks

March 2 2018: Monitoring packages construction and installation; system checks

March 5 2018: Monitoring packages construction and installation

March 6 2018: Monitoring packages construction and installation; pressure verification

March 7 2018: Inventory/cleanup; power installation

March 8 2018: Inventory/cleanup; power installation

March 13 2018: Cable routing; VBox Tower computer setup

March 14 2018: Cable routing; geophone installation

March 15 2018: Cable testing; DTS setup

March 16 2018: Monitoring system troubleshooting; data acquisition

March 19 2018: Water run test; sewer cam

March 20 2018: Water run test; E1-OT grouting

March 21 2018: E1-OB, E1-PBD grouting

March 22 2018: E1-PDT, E1-PSB, E1-PST grouting

March 26 2018: Sawmill

March 27 2018: Sawmill; water collection

March 28 2018: Sawmill; grout measurements; PSB flow measurement

March 29 2018: Pressure regulating valves installed; VFD controller remounted; seismic equipment inspection

March 30 2018: Lines connected


April 2018

April 3 2018: stim/flow connection; stage seismic equipment

April 4 2018: Seismic testing; stim/flow setup

April 5 2018: Seismic measurements; stim/flow setup

April 10 2018: Stim/flow system testing; seismic imaging; electrical resistance tomography imaging

April 11 2018: Stim/flow system testing; seismic imaging; electrical resistance tomography imaging

April 12 2018: Stim/flow shakedown setup; seismic imaging; electrical resistance tomography imaging

April 16 2018: Seismic imaging; electrical resistance tomography imaging

April 17 2018: Seismic imaging; thermistor hookup; pressure system test; water sampling

April 18 2018: Seismic imaging; thermistor hookup; pressure system demo; water sampling

April 19 2018: Seismic imaging; thermistor hookup; interference tests

April 23 2018: Saw mill; tool unpacking

April 24 2018: Seismic imaging; thermistor hookup; Quizix pressurization

April 25 2018: Seismic imaging; Triplex pressurization; packer conveyance; production packer assembly

April 26 2018: Seismic imaging; water chillers/240VAC installation; SIMFIP tool assembly

April 30 2018: downhole stimulation instrument setup; stim/monitoring equipment verification


May 2018

May 1 2018: downhole stimulation instrument setup; stim/monitoring equipment verification; borehole geophone grouting

May 2 2018: downhole stimulation instrument setup; stim/monitoring equipment verification; water air-lifting

May 3 2018: downhole stimulation instrument setup; stim/monitoring equipment verification; sonic logging

May 14 2018: Probe assembly; SIMFIP tool assembly; data transmissions

May 15 2018: stimulation tool assembly, probe insertion

May 16 2018: SIMFIP tool lowered; production probe assembly

May 17 2018: Injection packer conveyance; production packer assembly

May 21 2018: Production SIMFIP assembly; fracture stimulation 140 notch

May 22 2018

May 23 2018

May 24 2018

May 25 2018

May 29 2018

May 30 2018

May 31 2018


June 2018

June 5 2018

June 6 2018

June 7 2018

June 8 2018

June 11 2018

June 12 2018

June 13 2018

June 14 2018

June 19 2018

June 20 2018

June 21 2018

June 22 2018

June 25 2018

June 26 2018

June 27 2018

June 28 2018

June 29 2018


July 2018

July 6 2018

July 9 2018

July 10 2018

July 11 2018

July 12 2018

July 17 2018

July 18 2018

July 19 2018

July 20 2018

July 25 2018

July 26 2018


August 2018

August 8 2018


September 2018

September 11 2018

September 12 2018

September 13 2018

September 14 2018

September 25 2018

September 26 2018

September 27 2018