Amatitlan Geothermal Power Plant

From Open Energy Information

Revision as of 16:23, 14 May 2014 by Jweers (talk | contribs) (Text replace - "Amatitlán" to "Amatitlan")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Amatitlan Geothermal Power Plant

Loading map...

Wellhead steam/brine at 9 bar generates power in the Kato Engineering 1.2 MW back-pressure steam turbine (unit 3) before expanded steam is passed to the two Ormat 12 MW OEC Binary turbines (units 1 and 2).

References[edit]

  1. 1.0 1.1 1.2 1.3 http://globalenergyobservatory.org/geoid/43655
  2. 2.0 2.1 http://www.ormat.com/case-studies/amatitlanguatemala