Difference between revisions of "Alaska - AS 42.45.310 - Acquisition of Power Project"

From Open Energy Information

(Removed from Reference Library)
m (Reverted edits by Evogel (talk) to last revision by Htaylor)
Line 58: Line 58:
 
|Abstract=This section outlines the exemption of "power projects" from the requirement to obtain a CPCN.
 
|Abstract=This section outlines the exemption of "power projects" from the requirement to obtain a CPCN.
 
|ReferenceGenre=Bulk Transmission, Geothermal, Solar, Hydropower
 
|ReferenceGenre=Bulk Transmission, Geothermal, Solar, Hydropower
|RAPID=No
+
|RAPID=Yes
|RAPIDlocation=
+
|RAPIDlocation=Alaska
|RAPIDtopic=
+
|RAPIDtopic=Site Considerations, General Construction, Transmission Siting & Interconnection
 
|RAPIDsubtopic=
 
|RAPIDsubtopic=
 
}}
 
}}

Revision as of 09:34, 5 August 2016


OpenEI Reference LibraryAdd to library

Legal Document- Statute: Alaska - AS 42.45.310 - Acquisition of Power Project

Abstract
This section outlines the exemption of "power projects" from the requirement to obtain a CPCN.






Published 
N/A

Year Signed or Took Effect 
2014

Legal Citation 
A.S. 42.45.310


DOI 
Not Provided
Check for DOI availability: http://crossref.org


Online 
Internet link for Alaska - AS 42.45.310 - Acquisition of Power Project
Citation

Alaska - AS 42.45.310 - Acquisition of Power Project (2014).