Difference between revisions of "Alaska - AS 42.45.310 - Acquisition of Power Project"

From Open Energy Information

(Created page with "{{Reference |Document_type=Legal |InfographicType= |ThesisDissertation= |LegalType=Legal Document |LegalDocType=Statute |GuidanceType= |FormType= |FormTopic= |SectionChapter= ...")
 
Line 52: Line 52:
 
|WebSiteURL=
 
|WebSiteURL=
 
|ReferenceURL=http://www.legis.state.ak.us/basis/statutes.asp?title=42#42.45.310
 
|ReferenceURL=http://www.legis.state.ak.us/basis/statutes.asp?title=42#42.45.310
 +
|Abstract=This section outlines the exemption of "power projects" from the requirement to obtain a CPCN.
 
|ReferenceGenre=Geothermal, Solar, Bulk Transmission
 
|ReferenceGenre=Geothermal, Solar, Bulk Transmission
 
|RAPID=Yes
 
|RAPID=Yes

Revision as of 12:16, 12 September 2014


OpenEI Reference LibraryAdd to library

Legal Document- Statute: Alaska - AS 42.45.310 - Acquisition of Power Project

Abstract
This section outlines the exemption of "power projects" from the requirement to obtain a CPCN.






Published 
N/A

Year Signed or Took Effect 
2014

Legal Citation 
Not provided


DOI 
Not Provided
Check for DOI availability: http://crossref.org


Online 
Internet link for Alaska - AS 42.45.310 - Acquisition of Power Project
Citation

Alaska - AS 42.45.310 - Acquisition of Power Project (2014).




"Siting" is not in the list of possible values (Land Use, Land Access, Exploration, Well Field, General Construction, Power Plant, Environment, On Site Evaluation, Cultural Resources, Water Quality, Air Quality, Geological Resources, Aesthetic Resources, Waste & Hazardous Material, Water Access, Site Considerations, Transmission Siting & Interconnection, Plant Decommissioning, Biological Resources, Land Use Assessment) for this property.
,
"Grid Connection" is not in the list of possible values (Land Use, Land Access, Exploration, Well Field, General Construction, Power Plant, Environment, On Site Evaluation, Cultural Resources, Water Quality, Air Quality, Geological Resources, Aesthetic Resources, Waste & Hazardous Material, Water Access, Site Considerations, Transmission Siting & Interconnection, Plant Decommissioning, Biological Resources, Land Use Assessment) for this property.