18 CFR 5: Integrated License Application Process

From Open Energy Information

Revision as of 13:35, 18 March 2019 by Taylorcurtis (talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)


OpenEI Reference LibraryAdd to library

Legal Document- Federal Regulation: 18 CFR 5: Integrated License Application Process

Abstract
The section applies to filing and processing of a Federal Energy Regulatory Commission application for an original, new license or subsequent license for a hydropower project under the default licensing process.






Published 
N/A

Year Signed or Took Effect 
2014

Legal Citation 
18 CFR 5 et seq.


DOI 
Not Provided
Check for DOI availability: http://crossref.org


Online 
Internet link for 18 CFR 5: Integrated License Application Process
Citation

18 CFR 5: Integrated License Application Process (2014).